| Code of Conduct Team |
The Code of Conduct team is responsible for handling any issues
regarding unwanted behavior during Build, Camp, Take Down;
dwebcamp.org/conduct/
|
NEED – BUILD |
1 |
| Construction Team |
The construction team is responsible for handy work, building
things, from a small stage to benches; set up and decoration of
each tent; if you are good with power tools, have carpentry
skills, know how to build basic furniture — this is the team for
you. MUST BE ABLE TO ATTEND BUILD (July 1–8) & part of TAKE
DOWN (July 12–13).
|
NEED – BUILD/TAKE DOWN |
many |
| Demo Night Market Team |
Help recruit, set up, and support the Demo Night Market
presenters, each with their own table to share
Ready-for-public-use technologies. (No prototypes please!) This
is one of DWeb Camp's favorite events, where everyone gets a
hands-on chance to try out the latest ready-to-use tools; this
team must plan and support bandwidth-intensive platforms, so
there is a bit of logistics, power, and network know-how or team
integration involved.
|
NEED – BUILD |
4 |
| Equipment Team |
This team is in charge of keeping an inventory of all equipment,
deploying it to each venue, and then getting it all back to its
rightful owners or vendors. This is a critical part of the
BUILD, CAMP, and TAKE DOWN!
|
NEED – BUILD/TAKE DOWN |
4 |
| Light Team |
The Light team handles ambient decorative lights at DWeb Camp.
We also make sure that there are basic lights in place so we can
all see each other at night. Handles spotlights for main stage
during opening and closing ceremonies; helps source the lights
before event. MUST BE ABLE TO ATTEND BUILD (July 1–8) & part
of TAKE DOWN (July 12–13).
|
NEED – BUILD/TAKE DOWN |
4 |
| Logistics Team |
The Logistics team handles moving goods, building materials and
other stuff around, and other tasks requiring gloves and tools.
Loads & unloads trucks. MUST BE ABLE TO ATTEND BUILD (July
1–8) & part of TAKE DOWN (July 12–13).
|
NEED – BUILD/TAKE DOWN |
10 |
| Mesh Network Team |
Plans and builds mesh network; plans workshops for training in
mesh networking; maintains & troubleshoots system during
CAMP. MUST BE ABLE TO ATTEND BUILD (July 1–8) & part of TAKE
DOWN (July 12–13).
|
NEED – BUILD/TAKE DOWN |
many |
| Networking team |
Works extensively during BUILD to set up network to far ends of
camp; maintains & troubleshoots system during CAMP.
|
Peter & Arkadiy & NEED 3rd TEAM LEAD |
10 |
| Power Team |
The Power team works with Alte Hölle to make sure we have enough
power all over the venue. Primary workload for the team is
during BUILD and TAKE DOWN. During the conference, not much is
going on. MUST BE ABLE TO ATTEND BUILD (July 1–8) & part of
TAKE DOWN (July 12–13).
|
NEED – BUILD/TAKE DOWN |
many |
| Radio & Phone Operations Team |
We're in charge of all radio communications at DWeb Camp (the
two-way "walkie-talkie" type and the Volunteer Teams phone
system). We also keep track of radios in use and make sure we
always have a freshly-charged radio at the info/Registration
desk. It's also our job to make sure people are comfortable with
using the radios and know how to operate them. We introduce
volunteers to radio protocols and lingo for use on the venue, so
that we can avoid chaos and ensure clear, effective
communications.
|
NEED – BUILD |
2 |
| Shuttle Bus Team |
The Shuttle Bus team needs people with a driver's license
(category B, regular car up to 3500 Kg) and comfortable with
driving a larger car. Great opportunity to meet a lot of new
people! The shuttle will primarily drive to and from the local
train station to pickup and drop off people and in addition do
shopping trips to the local supermarket.
|
NEED – BUILD/TAKE DOWN |
2 |
| Stewards Team |
Stewards are in charge of running each of the main content
spaces. During the BUILD you help create your space, decorate
it, set up mood lighting.
Role Description
|
Wendy Hanamura (Lead) |
22 |